Fellow PGSuper Users,
Washington State DOT will be presenting a free webinar next month on Lateral Stability of Precast, Prestressed Concrete Bridge Girders. Richard Brice will be conducting the webinar and is a nationally known expert on the topic. I highly recommend attending. The seminar will not be recorded.
November, 9 2022 - Announcing BridgeLink Professional Version 7.0.2, PGSuper Professional 7.0.2 and PGSplice Professional 7.0.2. This new release fixes several bugs in PGSuper and PGSplice.
We recommend that all existing BridgeLink users update their software now! Go to https://pgsuper.com/content/downloads to get the latest. See below for information about the new update.
Announcing BridgeLink Professional Version 7.0, PGSuper Professional 7.0 and PGSplice Professional 7.0. This new release provides many new features and improvements to both PGSuper and PGSplice.
Announcing BridgeLink Professional Version 6.1, PGSuper Professional 6.1 and PGSplice Professional 6.1. This new release provides a critical bug fix to PGSplice and provides other minor fixes to both PGSuper and PGSplice.
Announcing BridgeLink Professional Version 6.0, PGSuper Professional 6.0 and PGSplice Professional 6.0. This new release introduces many new enhancements to our spliced and conventional prestressed-precast bridge design offerings.
April 20, 2020 - BridgeSight announces BridgeLink Professional Version 5.0, PGSuper Professional 5.0.2 and PGSplice Professional 5.0.2. This new release introduces many new features to our spliced and conventional prestressed-precast bridge design offerings.
January 21, 2020 - WSDOT Engineers have identified a bug for U-Beams in PGSplice 4.1.0-4.1.5. Secondary Post Tensioning effects are not computed correctly for all stressing stages for U-Beams.
When there are multiple stages for PT for U-Beams, the secondary effects of PT are not computed for the later stages. Investigation of the source code for generating the load revealed that the input number of ducts, not the actual number of ducts is used resulting in 1/2 of the actual PS force.
January 13, 2020
BridgeSight is pleased to announce the release of updated PGSuper Professional Configurations for the California Department of Transportation, Oregon DOT, and PCI North East. All configurations were updated for compliance to the AASHTO LRFD Bridge Design Specifications 8th Edition 2017 and including DOT amendments for CalTrans and ODOT. More details on the configurations can be found at:
Come See Us at the Western Bridge Engineers Seminar, September 4-6, 2019 - Boise, ID – Booth #54
BridgeSight will be unveiling new BridgeLink Professional software which includes new versions of PGSuper Professional, PGSplice Professional and a host of other bridge engineering tools. New features include Multi-span, Multi-stage Post-tensioned Spliced Girder Design, transformed section analysis, stand-alone girder handling and shipping analysis, and much more!!
Come See Us at the International Bridge Conference, June 10-12, 2019 - Gaylord National Convention Center, Washington, DC – Booth #329
BridgeSight will be unveiling new BridgeLink Professional software which includes new versions of PGSuper Professional, PGSplice Professional and a host of other bridge engineering tools. New features include Multi-span, Multi-stage Post-tensioned Spliced Girder Design, transformed section analysis, stand-alone girder handling and shipping analysis, and much more!!